In the process of mining construction, for stone crushing operations, not only must suitable crushers and other mining machinery be selected, but many other factors must also be considered.
First of all, there are strict restrictions on the crushing site. It is necessary to ensure that the installation site of the crusher must be solid and stable, and the stability of the site must be checked regularly after installation. The connecting bolts of each part of the foundation must be tightened to prevent any loose;
Secondly, the role of the lubrication station is also crucial. Therefore, the lubrication station must be started before the main engine of the crusher is started, and after production is completed, the lubrication machine must be shut down after the main engine stops;
Finally, it should be noted that the crusher cannot operate under load during the production and processing of materials. Therefore, it is necessary to carefully check whether there is any residual material in the crusher cavity before starting the machine every time. At the same time, it must be ensured that the feeding is done after the host is running normally, and the feeding must be even.